Project Info

Heavy Equipment Services for Drilling Site Construction and Rig Support – Sangasanga, East Kalimantan

Client: PT Pertamina Hulu Sangasanga
Project Code: PHSS-02
Location: Sangasanga – Muara Badak, Mutiara (East Kalimantan)
Period: 23 September 2024 – 22 September 2026
Status: On Progress

PT Jaya Mimika Lestari (PT JML) is trusted by PT Pertamina Hulu Sangasanga to provide heavy equipment services to support the creation of drilling locations and rig support needs in the Sangasanga area, East Kalimantan.

This project is part of operational support for the upstream oil and gas sector with a sustainable work system to ensure site readiness and smooth drilling activities.

Project Overview

For the PHSS-02 project, PT JML provided heavy equipment for drilling site preparation, land leveling, and rig operational support. The scope of work includes unit provision, equipment mobilization, and consistent operational management throughout the contract period.

Implementation is carried out in the Muara Badak and Mutiara areas with structured operational coordination to ensure the stability of field work until the end of the contract period in September 2026.

Site Development Support

Supports structured drilling site preparation.

Rig Operational Assistance

Supporting rig operational activities in the field.

Ongoing Contract Execution

Running according to the contract period until 2026.

Project Result & Benefits of Project

Since its inception in September 2024, the PHSS-02 project has been on-going, with heavy equipment actively supporting drilling site preparation and rig activities in the Sangasanga area in a stable and sustainable manner.