Project Info

Heavy Transport and Lifting Equipment Rental Services for Production Operations – Tarakan & Sembakung, North Kalimantan

Client: PT Pertamina EP – Regional 3 Zona 10
Project Code: TRK-SBK 2401
Reference No.: SA04026692A 
Location: Tarakan & Sembakung, North Kalimantan
Period: 27 Mei 2024 – 21 Oktober 2029
Status: On Progress

PT Jaya Mimika Lestari (PT JML) is trusted by PT Pertamina EP Regional 3 Zone 10 to provide heavy transport and lifting equipment rental services to support production operations in the Tarakan and Sembakung areas, North Kalimantan.

This project is a long-term contract with a continuous work system to ensure the stability and continuity of production activities in the operational area.

Project Overview

In the TRK-SBK 2401 project, PT JML provides a fleet of heavy transport and lifting equipment that plays an important role in supporting material mobilization and production operational needs in the Tarakan and Sembakung areas.

The scope of work includes the provision of units, fleet management, and consistent operational support throughout the contract period until October 2029. Project implementation is carried out with structured operational supervision to ensure unit availability, service stability, and continuity of production activities in the Pertamina EP Regional 3 Zone 10 work area.

Long-Term Operational Support

Long-term contract until 2029.

Production Support Deployment

Supporting sustainable production operations.

Strategic Regional Coverage

Operating in the Tarakan and Sembakung areas.

Project Result & Benefits of Project

Since its inception in May 2024, the TRK-SBK 2401 project has been on-going, supported by an active fleet that supports PT Pertamina EP’s stable and sustainable production operations. The continuation of this long-term contract reflects confidence in PT JML’s capabilities in maintaining unit readiness, consistent service, and structured operational support in the Tarakan and Sembakung areas until the end of the contract period.